Gilbert G Bishop, Age 972700 Battle Creek Rd, Charlotte, MI 48813

Gilbert Bishop Phones & Addresses

2700 Battle Creek Rd, Charlotte, MI 48813 (517) 543-2963

2736 Battle Creek Rd, Charlotte, MI 48813 (517) 543-2963

2770 Battle Creek Rd, Charlotte, MI 48813 (517) 543-5193

1949 Perkey Rd, Charlotte, MI 48813 (517) 543-5193

Covina, CA

2770 Battle Creek Rd, Charlotte, MI 48813 (517) 285-9484

Social networks

Gilbert G Bishop

Linkedin

Work

Position: Executive, Administrative, and Managerial Occupations

Education

Degree: Bachelor's degree or higher

Mentions for Gilbert G Bishop

Resumes & CV records

Resumes

Gilbert Bishop Photo 24

Gilbert Bishop

Publications & IP owners

Wikipedia

Gilbert Bishop Photo 25

Hugh Gilbert (Bishop)

The Right Reverend Hugh Edward Gilbert, OSB (15 March 1952 - ) is the Bishop of Aberdeen. He was appointed by Pope Benedict XVI on 4 June 2011. He had ...

Us Patents

Ice Island Structure And Drilling Method

US Patent:
4456072, Jun 26, 1984
Filed:
May 3, 1982
Appl. No.:
6/373976
Inventors:
Gilbert H. Bishop - Long Beach CA
International Classification:
E21B 700
E02D 1904
US Classification:
166362
Abstract:
An off-shore ice island structure for location over a submerged drill site in waters which normally freeze in winter. The structure includes a buoyant protective caisson which freezes in position over the drill site upon onset of winter. A barge floats on water kept unfrozen within the caisson, and is connected to the caisson so it can be swivelled generally about a vertical axis to adjust the circumferential location of the drilling axis of drilling apparatus carried on the barge. The drilling apparatus is movable relative to the barge to enable further adjustment of the drilling axis location. The arrangement enables the drilling axis to be maintained in substantial vertical alignment with the drill site despite movement of the caisson caused by the surrounding shelf ice. The caisson is part of an ice island structure whose mass is built up by successive flooding and freezing steps to ground it on the sea bed. The capability for fixing the location of the drilling axis despite shelf ice movement permits drilling operations to commence long prior to grounding of the ice island.

Apparatus And Method For Forming Off-Shore Ice Island Structure

US Patent:
4325656, Apr 20, 1982
Filed:
Jul 14, 1980
Appl. No.:
6/167931
Inventors:
Gilbert H. Bishop - Long Beach CA
International Classification:
E02D 1904
E02B 300
US Classification:
405217
Abstract:
A method and apparatus for forming an off-shore ice island structure in waters which normally freeze in the winter. The ice island is useful as a base for oil field operations, for oil and gas storage, for docking ships during thaw periods, and the like. The structure comprises a plurality of elongated hollow wall elements adapted to be vertically oriented and assembled in open water to form a bounded area. The elements become frozen in place during the winter and the bounded area is intermittently flooded at intervals to permit accumulation of ice sufficient to sink the ice island to the marine bottom. Additional wall elements are added to the first wall elements to form upward continuations to contain the flooding water and accumulated ice. Pumps are provided to convey water to the upper surface of the island for freezing, and to carry off brine during the freezing process. Refrigeration equipment can be utilized to keep the ice island in a frozen condition during seasonal thaws.

NOTICE: You may not use PeopleBackgroundCheck or the information it provides to make decisions about employment, credit, housing or any other purpose that would require Fair Credit Reporting Act (FCRA) compliance. PeopleBackgroundCheck is not a Consumer Reporting Agency (CRA) as defined by the FCRA and does not provide consumer reports.